So much track ballast, so little time!

Rail contractors faced access restrictions when renewing the sidings at Redhill Station, Surrey

Rail contractors working on a sidings renewal project in Surrey were faced with an unusual challenge. To keep things on track and finish the work on schedule, they needed to move 12,000 tonnes' worth of ballast from the site. Transporting the materials would be simple if conventional plant could be brought in to do the job, but there was a problem: access to the railway track was severely restricted.

2,000 african elephants' worth of track ballast!

Machinery couldn't get close enough to the track to enable contractors to move the ballast

No conventional machinery could get close enough to the site to transfer the large stockpile of ballast from where it was situated, some distance away from the track, into the track-mounted dumpers.

Heavy Duty GP600 conveyor

The solution

Coveya was able to help rail contractors find a solution to the problem of moving the ballast by installing a heavy-duty GP600 conveyor system.

In fact, both 30 and 40 metre systems were installed, along with a diesel powered generator to run them. These conveyors allowed the stockpile of ballast to be loaded from a safe distance away from the track, then transferred quickly and efficiently to the track-mounted dumpers.



Why not let Coveya see how much time and money you could save?

For more information contact us on:

0800 915 9195

Share

You May Also Like…

  • Replacing 500 tonnes of rail ballast per hour
    Replacing 500 tonnes of rail ballast per hour

    Crossrail contractor quickly replaces tonnes of ballast across a station platform with a bespoke conveyor solution

  • How to improve rail maintenance productivity
    How to improve rail maintenance productivity

    Find out how conveyors can save time and deliver higher output in rail maintenance projects

  • Conveyors for rail track maintenance infographic
    Conveyors for rail track maintenance infographic

    Take a look at our visual guide to making track possession time significantly more productive with conveyors

  • Excavation project overcomes access restrictions
    Excavation project overcomes access restrictions

    London contractors face traffic restrictions, footpath access regulations, and a site hemmed in by the River Thames