Zero downtime solution for a team of two

Zero downtime solution for a team of two

White Moss Horticulture needed a way to unpack the contents of approximately 2 million bags of compost so that it could be processed. But they had only a 2-person team to do it.

The project in numbers
  • 40,000 pallets (27 million kg) of compost to be unloaded, debagged, and processed

  • A two-person team to unload every bag from the pallets, cut them open and empty the compost into a hopper at above head height

  • One Easikit™ 900 conveyor angled from the ground to over the hopper

  • 550 bags per hour moved, emptied and processed

Easikit™ 900 conveyor angled from the ground to over the hopper

The conveyor shifted 550 bags per hour

The challenge

White Moss Horticulture found themselves with 40,000 pallets of compost that needed to be unloaded, debagged, and delivered up to a screener machine for processing. That's enough compost to fill 28 Olympic swimming pools!

Unfortunately, the pallets couldn't be dumped straight into the hopper: each plastic bag of compost had to be split open by hand to remove the compost from the plastic.

The throughput of the screener was also taken into consideration as overloading could cause a jam and create an expensive delay. Hand-loading the hopper seemed the only solution.

But how were two workers going to lift 15kg bags up into the out-of-reach hopper all day? It was a logistical and health and safety nightmare. The team needed a steady, mechanical system to keep the hopper loaded with minimal human effort.

Easikit 900 conveyor in action
The solution

Coveya visited the operations manager on site and recommended an Easikit 900 conveyor to move the bags up and into the hopper. One end would be on the ground (for easy loading) and the other end of the conveyor would discharge up into the 3m high hopper.

White Moss Horticulture staff were able to take turns: one loading bags at the bottom and one standing on the platform next to the conveyor cutting them open as they passed by.

Unlike a forklift or manual labour, the conveyor runs at a constant speed, 8 hours per day, with zero downtime.

With the belt running at a speed of about 1m/s, White Moss’s team of two was able to shift over 550 bags per hour, and completed roughly 1,300 pallets in the first two weeks.

Working with Coveya

The whole project took almost a year: 40,000 pallets is no small task. Once space had cleared, White Moss Horticulture hired a second Easikit 900 conveyor to double the throughput and complete the work more quickly.

Get in touch

Do you have a complex material-handling project that could use a conveyor? Find out how we can help.

Contact us

article

Useful Articles

Read our tips, best practice advice, safety and operations guides and case studies.

Knowledge base
guarantee

Our Guarantee

If our temporary conveyor system fails to provide real and identifiable project efficiencies, we’ll remove it and you won’t be charged.

Our service