Unit 1, St Ivel Way BS30 8TY Warmley, Bristol
UK-wide hire and worldwide sales
Free site survey
100% money back guarantee
30 years' experience

The GP750

Heavy-duty conveyor belt for demolition applications

The GP750
Talk to the experts
Get a free quote

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

The GP750

Product overview

The GP750's high-performance system and robust design make it the first choice for demolition sites across the UK. It’s wide belt and 5.5kW heavy-duty motor enable it to maintain a throughput of up to 300 tons per hour.

Designed primarily for the transporting of demolition spoils, it has a robust and compact design that fits a variety of project sites. The GP750 is engineered to be low-maintenance over a considerable lifespan, thereby minimising downtime on your site.

Can't find what you are looking for?

What's included?

Men talk about where to put the GP750 conveyor
Free site survey

To make sure you get the right conveyor for your project we’ll visit your site for a free, no-obligation survey. We’ll explain your options and help you choose the best conveyor for your needs.

Workman setting up a conveyor - GP750
Full installation

We’ll deliver and install your conveyor, train your team to use it, and provide servicing and maintenance to keep your project moving.

Girl talking about the GP750 conveyor to a customer
100% money-back guarantee

Our promise to you: If our temporary conveyor system fails to provide real and identifiable efficiency on your project, we'll remove it and you won't be charged.

Maximum throughput

300

tons per hour

Belt width

750mm

Maximum incline angle

30°

Setting up the GP750 on a demolition site

Reliable and efficient heavy-duty conveyor

The GP750 has been engineered to withstand the unrelenting conditions of a demolition site. It’s robust and yet flexible design means it can operate efficiently at inclines up to 30.

It’s hinged discharge point and integrated side panels allow it to be used safely on gantries over roadways, minimising your health and safety costs.

Low-maintenance design to minimise downtime
Close up picture of the sections on a GP750 conveyor

Specification

  • Length

    Up to 50m

  • Belt width

    750mm

  • Belt speed

    1m/s

  • Maximum throughput

    300 tons per hour

  • Motor power

    5.5kW

  • Hopper size (if used)

    1100x1100

  • Power supply

    415V

  • Maximum incline angle

    30°

  • Type of material

    Aggregate, Demolition rubble, Excavation spoil, Rubble, Small rubble, Soil

  • Loading method

    Bobcat, Excavator

  • Mobile or static

    Static

  • Industry

    Animal feeds & agriculture, Building & construction, Composting & biomass, Demolition, Excavation, Rail, Recycling

Gallery

Support

Service type Rental support Sales support

Full installation - We take care of onsite installation so you're set up and ready

Maintenance options - We can offer the right servicing and maintenance for you

Dedicated service team - Our dedicated service team is here to help with any conveyor issues when you need us

Scheduled servicing - We'll schedule onsite service visits every 4 weeks and maintenance during downtime

 

Spare parts… fast - Extensive spare parts stock and unmatched lead times to keep you moving