![Demolition: 120 Canon Street, London [GP750]](https://www.coveya.co.uk/content/uploads/2020/07/Canon-Street-GP750-demolition.jpg)
Demolition: 120 Canon Street, London [GP750]
Following a free on-site visit and design approval, we supplied on hire 1 x 6.0m GP750 that was tasked to move internal demolition arising inside the building which had a listed facade, out through a window opening to the muck away lorry.
Read more![Demolition : Cost savings for Gilpin Demolition [EK 1200 & EK Mobile]](https://www.coveya.co.uk/content/uploads/2020/04/585d0b5199fb3-gilpin-case-study-coveya-co-uk.jpg)
Demolition : Cost savings for Gilpin Demolition [EK 1200 & EK Mobile]
While demolishing the former Quality Hotel building in Plymouth, Gilpin Demolition needed our Easikit 1200 conveyors to remove asbestos cement from the rubble as quickly and safely as possible.
Read more![Demolition: Listed Mill, Manchester [EK 600 & GP750]](https://www.coveya.co.uk/content/uploads/2020/04/5dd290c0ebe5d-northbank.jpg)
Demolition: Listed Mill, Manchester [EK 600 & GP750]
Northbank Demolition removed the basement, ground floor and a further three floors and roof from the former listed mill leaving behind the four façade walls. With such a complex project within a constrained site, the Coveya EK600 and GP750 conveyor systems came into their own.
Read more